Book by 3 PM → delivered tomorrowOwn trucks · Midland, TX · (432) 271-7500
Hayes BrosDumpster RentalCall now(432) 271-7500Call
Large green roll-off dumpster at a commercial building job site

Construction Dumpster Rental in Midland, TX

20, 30 and 40-yard roll-offs for new builds, demolition and commercial projects. Swaps when full, call-ahead drops, and a direct line to the people driving the trucks.

  • Local hauler, our own trucks
  • Book by 3:00 PM for next-day delivery
  • Boards under the rails

What size dumpster do contractors use for new construction?

Most new homes and additions use a 30-yard dumpster, which includes 4 tons and holds 10 to 15 pickup loads of framing, drywall and packaging waste. A 20-yard suits small additions and finish-outs. Concrete, block and dirt go in a separate 10 or 15-yard.

JobDumpsterNotes
New single-family home, framing to trim30-yardPlan on swaps through the build
Home addition or garage20-yard or 30-yardDepends on demo plus new build
Commercial interior finish-out30-yardDrywall-heavy loads approach 4 tons
Major demolition or large commercial build40-yard40 cubic yards; holds 5 to 6 tons
Foundation or flatwork demo10-yard or 15-yardHalf full; clean loads get clean-fill pricing

How do dumpster swaps work on a job site?

A swap means we haul your full dumpster and drop an empty one in the same visit. Call when the container is close to full; a swap is priced as a new rental, so each container gets its own 7 days and included tons. Book by 3:00 PM for a next-day swap.

  1. Call for the swapBefore the box goes over the rim.
  2. Clear the accessKeep the approach open for the truck.
  3. Full out, empty inOne trip.
  4. Ticket per loadEach load has its own scale ticket on the invoice.

What rules apply to construction debris?

Federal rules apply on construction and demolition sites. OSHA requires an enclosed chute when debris is dropped more than 20 feet outside the exterior walls. EPA rules require an asbestos inspection before demolition or renovation of many buildings, and lead-safe practices for paid work in homes built before 1978.

TopicRuleOfficial source
Debris chutesEnclosed chute for drops over 20 ft outside exterior wallsOSHA 29 CFR 1926.252(a)
AsbestosInspection and, above thresholds, advance notice before demolition or renovationEPA 40 CFR 61.145
Lead paintLead-safe work practices for paid renovators in pre-1978 homesEPA RRP Rule
Secured loadsLoose loads must be secured on Texas roads; no debris above the rimTex. Transp. Code ch. 725

This is a summary, not legal advice. Confirm with your permit office or inspector.

Can you drop a dumpster when nobody is on site?

The driver can place the dumpster with nobody on site, as long as the drop zone is clear and marked. The driver calls or texts 20 to 30 minutes before arrival to confirm placement. Locked gates and parked equipment cause dry runs, which are $125.

Set up the dumpster for your next job.

Call now(432) 271-7500

No surprise bills

What will my construction dumpster bill include?

Every construction dumpster rental includes 7 days and a set weight by dumpster size. Weight over that is $75 per ton, billed by the exact pound from the certified landfill scale ticket, which comes with your final invoice 3 to 5 business days after pickup. Every 500 lb over the included weight costs $18.75.

  • Extra days: $25 each
  • Mattress, tire or Freon appliance: $50 each
  • Blocked drop or overfill: $125 dry run

Every fee, explained · how the scale ticket works

What can't go in the dumpster?

Hazardous chemicals, wet paint and batteries can't go in any Hayes Bros dumpster. Mattresses, tires and appliances that hold Freon (fridges, freezers, window AC units) can go in for $50 each, because the disposal site handles them separately. Most household junk, furniture, wood, drywall, shingles and yard debris are fine.

Full list of what can go in a dumpster, with where banned items go instead.

Straight answers

Construction dumpster questions

Do you offer construction dumpsters in Odessa and Big Spring?

We serve job sites within about 80 miles of Midland, including Odessa, Big Spring, Andrews and Stanton. See service areas or call with the address.

Can I put concrete in a 30-yard on a job site?

No. Concrete, block, brick and dirt go only in a 10 or 15-yard, loaded half full. Order a separate small box for flatwork demo.

How fast can you swap a full dumpster?

Book the swap by 3:00 PM for next-day service. Same-day is $50 extra when a truck is free.

Does each construction load get a scale ticket?

Every load is weighed at the landfill, and a copy of each ticket is attached to the invoice for that rental.

Roll-off truck carrying a dumpster

One call. Done.

Book your dumpster today

Tell us the job site, the phase of the build and how often you'll need swaps.

Book by 3:00 PM for next-day delivery · Deliveries 7:00 AM to 5:00 PM

Tap to call now:

(432) 271-7500
Call now(432) 271-7500Quote