Book by 3 PM → delivered tomorrowOwn trucks · Midland, TX · (432) 271-7500
Hayes BrosDumpster RentalCall now(432) 271-7500Call
Orange 15-yard roll-off dumpster on gravel beside a fence

Dumpster Sizes: Which One Do You Need?

10, 15, 20, 30 and 40-yard roll-offs, each with 7 days included. Answer three questions and get a size, or compare them side by side.

Which dumpster size do I need?

Most homeowners need a 10 or 15-yard dumpster for one room, a garage or a heavy load of concrete or dirt, and a 20-yard for a kitchen remodel, a roof of about 25 squares or a whole-house cleanout. Contractors building or adding on usually need the 30-yard, and major demolition or commercial jobs the 40-yard.

Size picker: 3 questions

1. What is the project?
2. How much?
3. Is most of it heavy?

How the picker decides

  • Heavy debris: 10-yard for small amounts, 15-yard for more. These are the only sizes allowed for concrete, dirt and brick, filled halfway.
  • Cleanouts: 10-yard for one room, 15-yard for a garage, 20-yard for a whole house.
  • Remodels: 10-yard for a bathroom, 20-yard for a kitchen, 30-yard for a whole-house or addition.
  • Roofs: 15-yard up to about 20 squares, 20-yard up to about 25, 30-yard beyond that or for two layers (one layer, 80-lb bundles).
  • New construction: 20-yard for small jobs, 30-yard for most homes, 40-yard for large builds.
  • Demolition or commercial: 30-yard for small jobs, 40-yard for most.

How big is each dumpster size?

The five Hayes Bros roll-off dumpsters run from 12 to 22 feet long and 3.5 to 8 feet high. The 10 to 30-yard include 2 to 4 tons with 7 days, and the 40-yard holds 5 to 6 tons. The 20, 30 and 40-yard share a 22-foot length; the walls get taller.

10, 15, 20, 30 and 40-yard dumpsters drawn to scale side by side: 12, 16, 22, 22 and 22 feet long; 3.5, 4.5, 4, 6 and 8 feet high10 YD12×8×3.5 ft15 YD16×7.5×4.5 ft20 YD22×8×4 ft30 YD22×8×6 ft40 YD22×7.5×8 ft
SizeOutside dimensionsPickup loadsIncluded weightRentalBest for
10-yard12 ft L × 8 ft W × 3.5 ft Habout 3 to 52 tons (4,000 lb)7 daysConcrete, dirt or brick (half full), a small bathroom remodel, a one-room cleanout
15-yard16 ft L × 7.5 ft W × 4.5 ft Habout 5 to 72.5 tons (5,000 lb)7 daysGarage cleanouts, small roof replacements, flooring or deck removal
20-yard22 ft L × 8 ft W × 4 ft Habout 7 to 103 tons (6,000 lb)7 daysWhole-house decluttering, kitchen remodels, most single-layer roofs
30-yard22 ft L × 8 ft W × 6 ft Habout 10 to 154 tons (8,000 lb)7 daysNew construction, home additions, large remodels and big cleanouts
40-yard22 ft L × 7.5 ft W × 8 ft Habout 12 to 16Holds 5–6 tons; included tons on your quote7 daysMajor demolition, new construction and large commercial projects

Pickup loads assume an 8-ft truck bed loaded level, about 2 to 3 cubic yards each. Weight over the included tons is billed at $75 per ton, by the exact pound. How weight is billed.

Still between two sizes? We'll size it with you on the phone.

Call now(432) 271-7500

What size dumpster do I need for my project?

Match the dumpster to the project and the debris weight. A bathroom fits a 10-yard, a two-car garage a 15-yard, a kitchen or a 25-square roof a 20-yard, and new construction a 30-yard. Concrete and dirt go only in the 10 or 15-yard.

ProjectTypical sizeWhy
Bathroom remodel10-yardTile and fixtures are heavy but small in volume
Garage cleanout (2-car)15-yardBulky but light; 5 to 7 pickup loads
Kitchen remodel20-yardCabinets and drywall take volume
Roof, one layer, up to ~25 squares20-yardAbout 240 lb per square at 80-lb bundles
Whole-house cleanout20 or 30-yardDepends on furniture and garage contents
New home or addition30-yardFraming and packaging waste is bulky
Major demolition or commercial job40-yard40 cubic yards; holds 5 to 6 tons
Concrete patio or driveway10 or 15-yardHeavy; half-full limit
Dirt or caliche10 or 15-yardHeavy; half-full limit

Typical fits, not guarantees. Bundle weights and debris mix change the answer.

Is it better to go one size up?

When unsure, one size up is usually cheaper overall. A dumpster that fills early needs a swap, priced as a new rental. A slightly larger dumpster costs only the difference in base price. The exception is heavy debris: concrete and dirt stay in the 10 or 15-yard at half full.

More guides: how weight is billed · what a dumpster costs · how to load it to fit more

Straight answers

Dumpster size questions

What is the most common dumpster size?

The 20-yard. It fits most kitchen remodels, single-layer roofs up to about 25 squares, and whole-house cleanouts, and it includes 3 tons.

What does 'yard' mean in a dumpster size?

Cubic yards of space. A 20-yard dumpster holds 20 cubic yards, about 7 to 10 pickup-truck loads. One cubic yard is a 3 × 3 × 3 ft cube.

What size dumpster do I need for concrete?

A 10 or 15-yard, filled no higher than halfway. Concrete weighs about 2 tons per solid cubic yard, so larger boxes would be too heavy to haul.

Can I change sizes after I book?

Any time before the truck is dispatched. Call and we will switch the size and confirm the new included weight.

Roll-off truck carrying a dumpster

One call. Done.

Book your dumpster today

Tell us the project and ZIP. We'll confirm the size, the all-in price and your delivery day in one call.

Book by 3:00 PM for next-day delivery · Deliveries 7:00 AM to 5:00 PM

Tap to call now:

(432) 271-7500
Call now(432) 271-7500Quote